
$250 off a switchboard upgrade
Swap the old fuse box for a modern board with safety switches on every circuit, and take $250 off the price.
See switchboard upgrades
Got a defect notice from Ausgrid or Endeavour, or a sagging service line? That work sits between the street and your meter box. We look for free and quote one fixed price.
Tell us what needs doing. We work out the number before anyone starts.
Or call 0449 154 812, day or night
What is on at the moment. Mention it when you ring and it goes on the quote.

Swap the old fuse box for a modern board with safety switches on every circuit, and take $250 off the price.
See switchboard upgrades
No call-out fee, day or night. We look at the job and give you a fixed price before anyone picks up a tool.
Call now
First time using us? Your first job comes off 15%, whatever it is.
Get a priceMost Sydney properties end up needing Level 2 work for one of these reasons.
Inspectors flag things like a loose point of attachment or a damaged meter panel, and the notice comes with a deadline.
A falling branch can rip the line off the house. A Level 2 provider must repair your side before reconnection.
Ducted air and an EV charger together can outgrow single phase. Upgrading means new mains, new service fuses and a metering change.
Demolition can't start until the old supply is disconnected. The builder then runs on temporary power until the permanent connection goes in.
Decades-old mains can have perished insulation or be too small for today's load. Replacing them means isolating at the pole or pit.
Add a second storey or a carport and the overhead line may end up too low. Moving it is Level 2 work.
Got a defect notice or not sure what you need? Ring us0449 154 812
On a typical Sydney house, this is the work that sits between the network and your switchboard.

New service lines and brackets where the old ones sag, have storm damage or no longer clear the driveway.

New cable in conduit from the street pit or pole to your meter box. Overhead services can be converted this way too.
Our own job photo
We replace cracked or tired meter panels, then refit the meter, service fuses and main switch on a sound, compliant board.
Our own job photo
Other trades and switchboard changes often need the supply off. We pull the service fuses, then reconnect once the work is tested.
Our own job photo
We set up the meter box and mains so a granny flat or duplex can be metered and billed separately.
Our own job photo
Each item on the notice gets fixed on your side of the connection, and the paperwork goes back to the network.
Network work takes more steps than an indoor job, mostly because the distributor needs to know.
We check the service line or pit, mains, meter box and any defect notice or connection offer, then give you one fixed price.
New supplies, connection changes and three phase upgrades need an application to Ausgrid or Endeavour Energy. Meter changes go through your retailer's metering provider.
Most jobs need the supply off for part of the day. We tell you when, so you can plan around fridges or medical equipment.
We isolate at the pole, pit or service fuse and test it dead before anyone touches a conductor.
The new line, mains or meter panel goes in to AS/NZS 3000 and the Service and Installation Rules of NSW.
We test insulation resistance, polarity and earthing, then energise. The CCEW goes to Building Commission NSW and the network gets its notice.
Photographs of jobs we finished and handed back. Our own work, not stock.

From the first phone call to the final test, this is how it runs.
Day or night. Tell us what is happening. If it sounds dangerous, we tell you what to switch off while we get moving.
Urgent faults go to the next available electrician. Planned work gets a set day so you are not waiting around.
We work out what is actually wrong on site rather than guessing over the phone. The visit costs you nothing.
Written down and explained before anyone starts. Nothing happens until you say yes.
Done to the Wiring Rules with the right parts. Dust sheets go down wherever we are working.
Every circuit we touch is tested before we leave. Where the law requires a compliance certificate, you get one.
The quote is the invoice. Our labour stays guaranteed for as long as you own the property.
Step one is a phone call0449 154 812
You can hold us to these on every job.
Coming out to look costs nothing, day or night, whether you go ahead or not.
Agreed before work starts. The quote is the invoice.
If something unforeseen turns up, we stop and talk to you first.
If our workmanship fails, we come back and fix it, for as long as you own the property.
Our labour guarantee is extra to your rights under Australian Consumer Law and the NSW Home Building Act.
Five of these can wait a week, but three cannot.
The deadline is on it, so book the fix well before it falls due.
Treat it as live. Stay at least 8 metres away and call 000.
That is a fire and shock risk. Call the network emergency line, then us.
It can mean a broken neutral. Stop using water and ring the network emergency line now.
It holds the weight of the line and only gets worse in a storm.
You may have undersized mains or a high resistance joint, so check before adding load.
We work out whether your supply copes or a three phase upgrade makes more sense.
The disconnection and new connection both need lead time with the network, so start early.
For urgent items, call Ausgrid 13 13 88 or Endeavour Energy 131 003, then us on 0449 154 812.
Ticked one of these?0449 154 812
The rules are the same for homes and businesses, but the scale and paperwork differ.

We plan the power-off around your household and tell you what the network needs.

We switch off when the doors are shut and set out strata quotes for committee approval.
We take Level 2 work right across Sydney, up the Central Coast and into the Blue Mountains. Open your area to find your suburb.
Matched to this kind of work where customers mention it, straight from our Google listing.
Jay is absolutely amazing!!! When I decided to install solar I was told I needed to upgrade my switchboard because of safety issue, then turned out I also needed to update...
I needed a level 2 electrician to install a private pole and new overhead lines. Within 4 days I went from no quotes to the job being complete. Great work from the boys...
I recently had my electrical system upgraded by Aus Electrical and Data Services with their Switchboard Upgrade and Level 2 service, and I couldn't be more impressed! …
Just wanted to reach out and thank you so much for the work you did for us. We used another electrician to do some data cabling in our house which ended up being a terrible...
I have recently called Aus Electrical & Data Services to get a quote for downlights around my house, sensor lights on the side and entry area. Jahfar is very responsive as I...
Jahfar and his team are second to none. It is shown through his services that i recently used that he is capable of handling absolute quality work of a professional...
I used J and his team to upgrade my parents panel. He was honest and upfront about costing. We spoke about doing some outdoor lighting for the backyard at my place, I spoke...
Outstanding and professional electricians with fair pricing. They arrived on time and even though there was an issue with road closures in my area at the time that I was...
I had an excellent experience with Aus Electrical and Data Services. From start to finish, the service was outstanding. He was extremely professional, arrived right on time...
It was great to have Jay and his team completing my list of complex tasks. They arrived on time and kept me informed as they progressed. There approach was professional and...
My wife & I was looking for an electrician & we googled it and found Aus Electrical and Data Services. We contacted them as they have great reviews and we know why! Jay was...
Not only was the outcome of his job perfect but so was his exceptional service. We were beyond satisfied with his efforts and professionalism in which he paid attention to...
If you’re looking for someone local and honest you can’t go past Jay from Aus Electrical and Data. Jay did a switchboard upgrade and fixed an earthing issue for us and it was...
Recently had some electrical work done at my property. Jahfar and his team went above and beyond to make sure works were done on time and to an exceptional standard. Safety...
I recently had the pleasure of working with Jahfar and I can't recommend him highly enough. He was incredibly efficient and professional throughout the entire process. He...
Fantastic work by Jahfar and his team! I called for a few light replacement and upgrade on some existing PowerPoint and switches with additional fan installations. They...
The hardest part of getting electrical work done in Sydney is not the work. It is finding someone who shows up when they said they would, tells you the price before they start, and does not leave you chasing them for a certificate afterwards.
Sydney is inside our normal run, as are Sydenham, Sydney, Sydney Olympic Park. We quote the whole job as one number before we start, and we do not charge to come and look at it.
Sydney has the mix you find across a lot of Sydney: older homes still running the board they were built with, sitting next to places that have been renovated two or three times. Both throw up their own problems, and both are jobs we do every week.
Older wiring around Sydney was never designed for the load a modern kitchen puts on it. Add an induction cooktop or a second fridge and the weak point shows up quickly.
A normal electrician cannot legally touch the part of your supply that belongs to the network. Anything from the street to your meter, the service line, the point of attachment, the metering itself, needs an accredited Level 2 service provider. That is a separate accreditation, not just experience.
The usual triggers around Sydney: your overhead service line has come down or is sagging, you are upgrading from single to three phase, you need a new meter installed or moved, you have had a defect notice from the network, or your consumer mains are too small for what the house now draws.
If you have been told you need your mains upgraded before a switchboard job can go ahead, that is Level 2 work, and it is usually cheaper to do both at once than to bring two crews out.
Age is the biggest single factor. Wiring installed decades ago was sized for a very different household, and insulation on older cable gets brittle and cracks, particularly in roof spaces that heat up through summer.
Storms take a toll, especially on anything overhead. A surge through the supply can quietly damage a board or an appliance and the symptoms show up weeks later.
We do not publish a price for this, and you should be careful of anyone who does. Two houses in Sydney on the same street can need very different work depending on the age of the wiring and what has been added to it over the years.
What we can promise is the shape of it. We come out and look for nothing, we work out what the job actually needs, and we give you one fixed number for the whole thing. If we find something unexpected once we are into it, we stop and talk to you rather than adding it to the bill. The number you agreed is the number on the invoice.
An hourly rate puts the risk on you. Every delay, every trip back to the van, every part that turns out to be the wrong one lands on your invoice. That is the opposite of what most people in Sydney actually want, which is to know the number before they say yes.
We price the job, not the time. That means we carry the risk of it taking longer, which is a good incentive for us to turn up prepared. It also means you can say yes or no with the full number in front of you.
Almost nothing, and that is not us protecting our own work. In New South Wales it is against the law for an unlicensed person to do fixed electrical wiring, and the insurance consequences of a fire traced back to unlicensed work are severe. Replacing a plug top on an appliance or changing a lamp is fine. Anything behind the wall or inside the board is not.
Before you call, switch off the appliance you suspect and see whether the problem goes away. If the board holds with that one thing unplugged, you have found it, and the visit gets much shorter.
If you rent, electrical repairs to the property itself are the owner's responsibility, and urgent electrical faults fall under urgent repairs in New South Wales. Talk to your agent first. If it is genuinely dangerous, say so clearly, because that changes how quickly it has to be dealt with.
If you manage a strata block around Sydney, we can work on common property and bill the body corporate directly, and we can keep the same electrician on your building so nobody is relearning the site every visit.
The ones we get asked most. If yours is not here, ring and ask.
They are accreditation levels under the NSW Accredited Service Provider scheme. Level 1 builds the network itself, like street mains and substations, while Level 2 covers service lines, connection, disconnection and metering work. Level 3 designs network assets.
Only the wiring inside your property. In NSW, network connections, service line work and pulling service fuses all need Level 2 accreditation, held in classes: 2A disconnect and reconnect, 2B underground, 2C overhead, 2D metering and energising.
Usually you do. Work on your side is contestable, so you choose and pay the Level 2 provider, while damage to the network's own assets is theirs to fix. Ownership lines vary, so we check where it falls before quoting.
The deadline is printed on the notice and depends on how serious the defect is. Send us a photo when you ring and we'll tell you what's involved. Miss it and the network may disconnect the supply.
It depends on the job. A service fuse swap is quick, while new underground mains or a meter panel rebuild takes longer. Your quote includes the expected power-off window.
The main drivers are overhead or underground, trench length, whether the meter panel needs replacing, and single or three phase. We look at no charge and give you one fixed price before starting. If something unforeseen turns up, we stop and talk to you first.
The old supply is disconnected and made safe before demolition. Your builder then usually needs a temporary supply, and the permanent connection is energised once the house wiring is tested. Each step needs lead time with the network, so talk to us when you sign with your builder.
Usually the owners corporation, since mains and meter panels serving more than one lot tend to be common property. We can quote through your strata manager, plan the power-off around residents and supply the certificates for the building records.
Question not on the list?0449 154 812
Send the job through and we come back with one price for the whole job. If it is urgent, ring instead. The phone is answered day and night.
Your name, number and the job. We come back with one price.
Or call 0449 154 812, day or night